Jump to content

Manufacturing units of Mohan Spintex

From Mohan Wiki
Revision as of 17:37, 16 September 2026 by Admin (talk | contribs) (Import from wiki-src)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Aerial view of Unit 4

Mohan Spintex India Limited (MSIL) operates several manufacturing units in Krishna district, Andhra Pradesh, near its headquarters in Vijayawada. Trade press reports units at Vattigudipadu, Remalle and Mallavalli;[1] the company's photographic archive also records Units 1, 2, 3 and 4.[2]

Units

Unit Location Established Notes
Unit 1 Vattigudipadu 2006 First unit; began with 14,400 spindles[1]
Unit 2 Remalle 2012 Solar power project inaugurated 2022[3][4]
Unit 3 [confirmation needed] Foundation 2013 [5]
Unit 4 [confirmation needed] [confirmation needed] [6]
Mallavalli Mallavalli 2019 Visited by the Union Textiles Minister in 2026[7][8]

Unit 1, Vattigudipadu

Unit 1

Unit 1 at Vattigudipadu is where MSIL began commercial production in October 2006, with 14,400 spindles.[1] A second phase was begun in 2007.[9]

Unit 2, Remalle

Unit 2, Remalle
Entrance signage at Unit 2

Unit 2 at Remalle was inaugurated in 2012, after a foundation ceremony in 2009.[10][3] The unit has hosted plantation drives, bank and government visits, and in 2022 the inauguration of a solar power project.[4]

Mallavalli

The Mallavalli unit, in the Mallavalli industrial area, was inaugurated in 2019.[1][7] In 2026 it was visited by Union Textiles Minister Giriraj Singh.[8]

Corporate office

The corporate office is at Gunadala, Vijayawada.[11]

References

  1. ↑ 1.0 1.1 1.2 1.3 (21 June 2022). "Mohan Spintex – India's fastest growing textile manufacturer". The Textile Magazine. Retrieved 16 September 2026.
  2. ↑ "Factories and Infrastructure". MSIL Digital Archive. Mohan Spintex India Limited. Retrieved 16 September 2026.
  3. ↑ 3.0 3.1 "Inauguration of Unit 2, 2012". MSIL Digital Archive. Mohan Spintex India Limited. Retrieved 16 September 2026.
  4. ↑ 4.0 4.1 "Solar Power Project Inauguration, Unit 2, 2022". MSIL Digital Archive. Mohan Spintex India Limited. Retrieved 16 September 2026.
  5. ↑ "Bhoomi Puja, Unit 3, 2013". MSIL Digital Archive. Mohan Spintex India Limited. Retrieved 16 September 2026.
  6. ↑ "Factories and Infrastructure: Unit 4". MSIL Digital Archive. Mohan Spintex India Limited. Retrieved 16 September 2026.
  7. ↑ 7.0 7.1 "Mallavalli Inauguration, 2019". MSIL Digital Archive. Mohan Spintex India Limited. Retrieved 16 September 2026.
  8. ↑ 8.0 8.1 "Union Textiles Minister Shri Giriraj Singh Visit to Mallavalli Unit, 2026". MSIL Digital Archive. Mohan Spintex India Limited. Retrieved 16 September 2026.
  9. ↑ "Phase II Bhoomi Puja, Unit 1, 2007". MSIL Digital Archive. Mohan Spintex India Limited. Retrieved 16 September 2026.
  10. ↑ "Bhoomi Puja, Unit 2, 2009". MSIL Digital Archive. Mohan Spintex India Limited. Retrieved 16 September 2026.
  11. ↑ "Mohan Spintex India Limited (MSIL)". mohanspintex.com. Retrieved 16 September 2026.