Manufacturing units of Mohan Spintex

Revision as of 23:58, 16 September 2026 by Admin (talk | contribs) (Import from wiki-src)

Mohan Spintex India Limited (MSIL) operates several manufacturing units in Krishna district, Andhra Pradesh, near its headquarters in Vijayawada. Trade press reports units at Vattigudipadu, Remalle and Mallavalli;[1] the company's photographic archive also records Units 1, 2, 3 and 4.[2]

Aerial view of Unit 4

Units

Unit Location Established Notes
Unit 1 Vattigudipadu 2006 First unit; began with 14,400 spindles[1]
Unit 2 Remalle 2012 Solar power project inaugurated 2022[3][4]
Unit 3 [confirmation needed] Foundation 2013 [5]
Unit 4 [confirmation needed] [confirmation needed] [6]
Mallavalli Mallavalli 2019 Visited by the Union Textiles Minister in 2026[7][8]

Unit 1, Vattigudipadu

 
Unit 1

Unit 1 at Vattigudipadu is where MSIL began commercial production in October 2006, with 14,400 spindles.[1] A second phase was begun in 2007.[9]

Unit 2, Remalle

 
Unit 2, Remalle
 
Entrance signage at Unit 2

Unit 2 at Remalle was inaugurated in 2012, after a foundation ceremony in 2009.[10][3] The unit has hosted plantation drives, bank and government visits, and in 2022 the inauguration of a solar power project.[4]

Mallavalli

The Mallavalli unit, in the Mallavalli industrial area, was inaugurated in 2019.[1][7] In 2026 it was visited by Union Textiles Minister Giriraj Singh.[8]

Corporate office

The corporate office is at Gunadala, Vijayawada.[11]

References

  1. 1.0 1.1 1.2 1.3 (21 June 2022). "Mohan Spintex – India's fastest growing textile manufacturer". The Textile Magazine. Retrieved 16 September 2026.
  2. "Factories and Infrastructure". MSIL Digital Archive. Mohan Spintex India Limited. Retrieved 16 September 2026.
  3. 3.0 3.1 "Inauguration of Unit 2, 2012". MSIL Digital Archive. Mohan Spintex India Limited. Retrieved 16 September 2026.
  4. 4.0 4.1 "Solar Power Project Inauguration, Unit 2, 2022". MSIL Digital Archive. Mohan Spintex India Limited. Retrieved 16 September 2026.
  5. "Bhoomi Puja, Unit 3, 2013". MSIL Digital Archive. Mohan Spintex India Limited. Retrieved 16 September 2026.
  6. "Factories and Infrastructure: Unit 4". MSIL Digital Archive. Mohan Spintex India Limited. Retrieved 16 September 2026.
  7. 7.0 7.1 "Mallavalli Inauguration, 2019". MSIL Digital Archive. Mohan Spintex India Limited. Retrieved 16 September 2026.
  8. 8.0 8.1 "Union Textiles Minister Shri Giriraj Singh Visit to Mallavalli Unit, 2026". MSIL Digital Archive. Mohan Spintex India Limited. Retrieved 16 September 2026.
  9. "Phase II Bhoomi Puja, Unit 1, 2007". MSIL Digital Archive. Mohan Spintex India Limited. Retrieved 16 September 2026.
  10. "Bhoomi Puja, Unit 2, 2009". MSIL Digital Archive. Mohan Spintex India Limited. Retrieved 16 September 2026.
  11. "Mohan Spintex India Limited (MSIL)". mohanspintex.com. Retrieved 16 September 2026.